To enlong the machine life time,the machine
maintain is very important.,good maintain could reduce the cost and improving
the production.Important,good machine could provide high quality products.
1.As a new machine ,then we should checking
the machine before operation
Checking the oil tank:the volume should
within the capacity
Checking the oil and indoor temperature:
when the temperature is so low,then we should pre-hot the oil,if the temperature
is so high,then we should adopt cooling equipment.
Checking the pressure gage,it could back to
"0" or not
Checking the temperature control
part:temperature controller,temperature sensor ,heating ring and so on.
2.when operating plastic injection molding machine:checking
the pump send out the oil or not,with arguly voice or not,pressure gage normal
or not?
3.Checking the oil ,pump shell,
electromagnet temperature:oil temperature should be from 20 centigrade to 50
centigrade,pump shell temperature should be high than the indoor temperature
from 10 centigrade to 30 centigrade.
4.Checking the voice :checking the oil pump
,electromagnet have arguly voice or not,keeping it at a good statues.
5.Pressure gage checking
6.Electrical device working condition,
safety device reliability inspection
7.Checking column, oil cylinder components
fastening nut and screw loose or not
8.When off work,should checking the
machine,every parts back to good statues or not
9. Every three months checking the
machine,and every year checking the machine
Snow
Export3@cnmould.com
没有评论:
发表评论